Launch of an energy renovation operation at the Royal Abbey of Fontevraud

Published on 15 February 2011 - Updated 24 February 2011
Cet article date d'il y a plus de 10 ans

Following a preliminary study piloted by the Regional SEM on behalf of the CCO, the Region has commissioned the Société Publique Régionale des Pays de la Loire to carry out the operation, which comprises construction of an energy and technical pole along with overall rehabilitation of the Hôtel Saint Lazare. Objective: rationalisation of the entire structure, envisaging energy supply renovation throughout.

With regard to means of heating, the wood-fired boiler solution has been selected for ecological and economic reasons. Some hundred square metres of solar panels may be brought in to complete the installations. A study has been carried out with the Chief Architect of Historical Monuments in order to determine conditions for incorporating the panels into this listed site. 

The technical pole for heating the monument has a budget of around 6M€, with delivery planned for the autumn of 2012. The solar panels would be installed on the Hôtel Saint Lazare roof (with completion of work planned for the spring of 2013). 

On the web:

News

© ABFPM / Olivier Sampson

29/07/2021

[Fr] Le petit illustré du patrimoine mondial

Alors que démarre la 44e session du Comité du patrimoine mondial, l’ABFPM dévoile un nouvel outil de médiation destiné à tous : le Petit illustré...

29/07/2021

[Fr] Festival de Loire 2021

La 10e édition du festival de Loire se tiendra du 22 au 26 septembre à Orléans. Ce grand rassemblement de marine fluviale célèbre tous les 2 ans la...

29/07/2021

[Fr] Les assemblées de Loire

Poursuivant le travail initié avec le parlement de Loire, "Les assemblées de Loire" est un événement public porté par le POLAU-pôle arts & urbanisme...